Works reduced the current inpatient bed capacity in the existing Cato 3 ward and repurposed consulting rooms, offices, lift lobby and reception areas for the new unit.
DNA recommended structural engineering design changes to support the radiology equipment based on previous experience, which reduced the construction time and resulted in better millimetre-perfect tolerances for ceiling mounted equipment.