The scope included internal building modifications and fitout works across both ground floor and mezzanine areas, incorporating new office, boardroom, customer, and operational spaces. Key upgrades involved the installation of glazed partitions, extension of internal walls, and integration of new building elements to suit updated functional requirements.
Significant services upgrades were undertaken, including new electrical, mechanical, and hydraulic systems. This included the installation of lighting, power and data infrastructure, HVAC systems tailored to various operational zones, and plumbing services to support amenities and kitchenette facilities.
Specialised installations were incorporated to support equipment and operational needs, including machine connections, ventilation systems, and controlled climate environments within designated production and testing areas.
Internal finishes were upgraded throughout, including flooring systems, waterproofing to wet areas, and the installation of durable materials suited to an industrial setting with office-grade finishes in shared and administrative spaces.
The project also included the installation of glazing to key areas such as boardrooms and customer lounges, improving visibility, natural light, and overall presentation of the facility.
Delivered within an operational industrial environment, the works required careful coordination, staging, and planning to minimise disruption to day-to-day activities while maintaining site safety and efficiency.
The completed project provides a modernised and highly functional facility, supporting both operational performance and staff amenity through a coordinated program of upgrades and targeted building improvements.